I had to cut a section of the sub floor out and replace it.
These are photos of the same bathroom. The client also wanted me to replace the flooring. On this job I had to also take up some of the sub flooring around the tub, because it was rotten.
These are photos of he same floor finished.
Sunday, July 15, 2012
This is the ceiling after I repaired it.
This is a ceiling that colapsed on a client of mine.